Projects of 2008

Date Project
Nov 08 Lease of ARGO 8WD for geotechnical project
Nov 08 Multibeam bathymetric survey of dredge borrow area in Umm Al Quwain.
Nov 08 Bathymetric & topographic survey, tide observations & tidal analysis for datum establishment at Nurai Island
Nov 08 Bathymetric & topographic survey of Eritrea island in “The World” project.
Nov 08 Bathymetric & topographic survey of  Nowaya island in “The World” project.
Nov 08 Bathymetric & topographic survey of Norway island in “The World” project.
Nov 08 Bathymetric & topographic survey of France & Spain islands in “The World” project.
Oct 08 Installation, interfacing & calibration of GPS systems & vehicle tracking software for ground control of aircraft movements between runways & aprons at Abu Dhabi Airport.
Oct 08 Topographic Survey for new road access & junction in Dubai
Sept 08 Bathymetric & Topographic handover acceptance survey of Arkangel island in “The World”
Aug 08 Hire of  vessel, crew & dive team for assistance with environmental survey at Ras Al Akhdar
Aug 08 Bathymetric & topographic survey for beach resort project in Dubai.
July-Sept 08 For Ghantoot Channel project – Deployment & recovery of 2 ADCP & Wave units for one month, 2 tidegauges and a weather station for 2 months, analysis of data. Bathymetric & Topographic survey, water & sediment sampling & analysis
July 08-Jan 09 Lease of vessel & crew for dredging & reclamation project in Dubai.
July 08 Bathymetric survey for outfall route on Palm Jumeirah
July 08 Post dredge bathymetric survey
July 08 Deployment/Recovery of 2 ADCP/Wave monitors and CTD recorders for 1 month observations.
July 08 Multibeam bathymetric surveys for Dubai Maritime City.
July 08 Multibeam bathymetric survey in Dubai.
June 08 Gyro & GPS calibration for Hopper Dredger “Seaway”
June 08 Bathymetric & topographic survey with tide & weather observations.
June 08 Multibeam bathymetric survey of 30km Mussafah Channel.
June 08 Geotechnical Investigation using washbore equipment.
May/June Topographic, bathymetric & sub bottom profiling survey in Bahrain.
May/June Deployment/Recovery of 2 additional ADCP/Wave monitors for 1 month observations.
May 08 Rental of Amphibious vehicle.
May 08 Gyro & GPS calibration for Hopper Dredger “Seaway”
May 08 Lease of vessel & crew for environmental monitoring
April 08 Deployment/Recovery of ADCP/Wave monitors for 1month observations.
April 08 Earthworks as built topographic survey.
April 08 Rental of survey equipment
April 08 Hire of land surveyor for reclamation as built surveys.
April/May 08 Survey vessel hire for project in Eastern Region.
April 08 Landfall topographic survey for proposed pipeline route in Fujairah.
Mar 08 Lease of vessel crew & accommodation unit for offshore environmental baseline study.
Mar 08 Earthworks as built topographic survey.
Mar-May 08 2 months tidal recording at 3 locations, analysis of acquired Data, along with 12 months data from 2 other locations to ascertain relationships between stations, ACD, MSL etc.
Mar 08 Lease of vessel & crew for environmental monitoring
Mar 08 Pre Dredge/Pre reclamation bathymetric survey.
Mar 08 Post dredge bathymetric survey.
Mar/Apr 08 Bathymetric & sub bottom profiling survey, sediment sampling & analysis. Dredging consultancy.
Mar/Apr 08 Deployment of 4 x ADCP, 4X tidegauges, 2 wave monitors, & 1 weather station. Water profile monitoring at 12 locations for current, temp & salinity.
Feb 08 Dubai Port project, approach channel bathymetric Survey.
Feb 08 Suwa Island bathymetric survey.
Feb 08 Survey vessel hire for Khalifa Port project.
Feb 08 Vessel & crew hire.