Date | Project |
---|---|
Nov 08 | Lease of ARGO 8WD for geotechnical project |
Nov 08 | Multibeam bathymetric survey of dredge borrow area in Umm Al Quwain. |
Nov 08 | Bathymetric & topographic survey, tide observations & tidal analysis for datum establishment at Nurai Island |
Nov 08 | Bathymetric & topographic survey of Eritrea island in “The World” project. |
Nov 08 | Bathymetric & topographic survey of Nowaya island in “The World” project. |
Nov 08 | Bathymetric & topographic survey of Norway island in “The World” project. |
Nov 08 | Bathymetric & topographic survey of France & Spain islands in “The World” project. |
Oct 08 | Installation, interfacing & calibration of GPS systems & vehicle tracking software for ground control of aircraft movements between runways & aprons at Abu Dhabi Airport. |
Oct 08 | Topographic Survey for new road access & junction in Dubai |
Sept 08 | Bathymetric & Topographic handover acceptance survey of Arkangel island in “The World” |
Aug 08 | Hire of vessel, crew & dive team for assistance with environmental survey at Ras Al Akhdar |
Aug 08 | Bathymetric & topographic survey for beach resort project in Dubai. |
July-Sept 08 | For Ghantoot Channel project – Deployment & recovery of 2 ADCP & Wave units for one month, 2 tidegauges and a weather station for 2 months, analysis of data. Bathymetric & Topographic survey, water & sediment sampling & analysis |
July 08-Jan 09 | Lease of vessel & crew for dredging & reclamation project in Dubai. |
July 08 | Bathymetric survey for outfall route on Palm Jumeirah |
July 08 | Post dredge bathymetric survey |
July 08 | Deployment/Recovery of 2 ADCP/Wave monitors and CTD recorders for 1 month observations. |
July 08 | Multibeam bathymetric surveys for Dubai Maritime City. |
July 08 | Multibeam bathymetric survey in Dubai. |
June 08 | Gyro & GPS calibration for Hopper Dredger “Seaway” |
June 08 | Bathymetric & topographic survey with tide & weather observations. |
June 08 | Multibeam bathymetric survey of 30km Mussafah Channel. |
June 08 | Geotechnical Investigation using washbore equipment. |
May/June | Topographic, bathymetric & sub bottom profiling survey in Bahrain. |
May/June | Deployment/Recovery of 2 additional ADCP/Wave monitors for 1 month observations. |
May 08 | Rental of Amphibious vehicle. |
May 08 | Gyro & GPS calibration for Hopper Dredger “Seaway” |
May 08 | Lease of vessel & crew for environmental monitoring |
April 08 | Deployment/Recovery of ADCP/Wave monitors for 1month observations. |
April 08 | Earthworks as built topographic survey. |
April 08 | Rental of survey equipment |
April 08 | Hire of land surveyor for reclamation as built surveys. |
April/May 08 | Survey vessel hire for project in Eastern Region. |
April 08 | Landfall topographic survey for proposed pipeline route in Fujairah. |
Mar 08 | Lease of vessel crew & accommodation unit for offshore environmental baseline study. |
Mar 08 | Earthworks as built topographic survey. |
Mar-May 08 | 2 months tidal recording at 3 locations, analysis of acquired Data, along with 12 months data from 2 other locations to ascertain relationships between stations, ACD, MSL etc. |
Mar 08 | Lease of vessel & crew for environmental monitoring |
Mar 08 | Pre Dredge/Pre reclamation bathymetric survey. |
Mar 08 | Post dredge bathymetric survey. |
Mar/Apr 08 | Bathymetric & sub bottom profiling survey, sediment sampling & analysis. Dredging consultancy. |
Mar/Apr 08 | Deployment of 4 x ADCP, 4X tidegauges, 2 wave monitors, & 1 weather station. Water profile monitoring at 12 locations for current, temp & salinity. |
Feb 08 | Dubai Port project, approach channel bathymetric Survey. |
Feb 08 | Suwa Island bathymetric survey. |
Feb 08 | Survey vessel hire for Khalifa Port project. |
Feb 08 | Vessel & crew hire. |